A freshly sealcoated black asphalt driveway in front of a stone-front home with a three-car garage

Asphalt sealcoating

Asphalt Driveway Sealcoating for Utah Homeowners

Driveway sealcoating for homeowners, not parking lots.

Book My Sealcoat

  • Veteran Owned
  • Licensed and Insured
  • Published Pricing
  • Most Jobs in One Day

Bluestone Surfaces sealcoats residential asphalt driveways in Salt Lake and Utah County for $0.32 per square foot, with a $295 minimum. Every job gets pressure washing prep and two coats of asphalt-emulsion sealer, never coal tar, and crack filling is priced up front at $1.50 per foot.

Published prices

How much does driveway sealcoating cost?

Asphalt sealcoating prices
ItemPriceDetails
Driveway sealcoat $0.32/sq ft Clean, edge, oil-spot prime, 2 coats of asphalt emulsion
Job minimum $295 Covers driveways up to about 921 sq ft
Hot-pour crack fill $1.50/linear ft First 25 ft included on driveways over 800 sq ft
Oil-spot treatment Included Primer over oil and fluid stains
Light commercial From $0.20/sq ft Church lots, small offices, HOA private lanes above 5,000 sq ft, quoted per job
Example driveways
DrivewaySealcoat price
Short driveway, 500 sq ft$295
Two-car driveway, 720 sq ft$295
Long driveway, 1,200 sq ft$384

Crack fill is extra where needed and always quoted before we start. Striping is not offered.

What's included

What comes with every sealcoat?

  • Pressure washing and blowing the surface clean
  • Edging along concrete, curbs and lawn
  • Oil-spot priming so sealer bonds over old stains
  • 2 coats of polymer-modified asphalt-emulsion sealer
  • Barricades or tape so nobody drives on it early
  • Cleanup and a short aftercare sheet

Why does Utah asphalt fail?

Asphalt is held together by oil-based binder, and four things wear it out fast here. High altitude sun oxidizes the binder until the surface turns gray and brittle. Freeze and thaw pushes water into small cracks and pries them open every winter. Snow plows scrape the surface, and de-icing salt keeps it wet and works into the cracks.

Sealcoat puts a fresh, flexible layer over the binder that blocks UV and water. It does not fix structural failure, but done every 2 to 3 years it slows all four.

Weather rules

When can a driveway be sealcoated?

We follow the manufacturer's rule: 50 degrees and rising for a 24-hour period, no rain within 24 hours, and 24 hours before driving. On the Wasatch Front that means about mid-May through September, plus warm October days. We would rather reschedule than seal in the wrong weather.

New asphalt

Is my new driveway ready?

New asphalt needs to cure before it is sealed: at least four weeks under the SealMaster spec, and the Colorado Asphalt Pavement Association suggests 30 to 90 days at 70 degrees or above. If your driveway is new, tell us the pour date and we will schedule the first safe window.

Coal tar or asphalt emulsion?

There are two main kinds of driveway sealer. Coal-tar sealer has been banned statewide in Maine, Minnesota, New York, Washington and Washington, D.C. over health and environmental concerns, and the USGS notes it is more common east of the Continental Divide. Asphalt-based sealer is the common choice in the West.

We use asphalt emulsion only. It is the better choice for homes with kids and pets, and you will not have to wonder what is tracking into the house.

Our process

How is a driveway sealcoated?

  1. Clean

    We pressure wash and blow the surface so sealer bonds to asphalt, not dust.

  2. Crack fill

    Cracks get hot-pour crack filler, priced per foot up front, and cure before sealer goes on.

  3. Prime

    Oil and fluid stains get a primer so the sealer does not peel over them.

  4. Edge

    We hand-edge along concrete, curbs and lawn for a clean line.

  5. Two coats

    Two coats of asphalt emulsion, applied only in the right weather.

  6. Cure

    The driveway is blocked off, and we tell you when it is safe to walk and drive on.

How do I care for a freshly sealed driveway?

  • Keep cars off for 24 hours and people off for the first several hours.
  • Turn sprinklers that reach the driveway off for 24 hours.
  • Avoid sharp turns with the steering wheel while parked for the first few days.
  • Rinse oil and fluid drips promptly, and plan to reseal every 2 to 3 years.

Questions

Driveway sealcoating FAQs

Spots fill up fast in sealcoat season.

Call or text 801-901-3927. We schedule sealcoating only in the right weather, May through September.